Community Work Day · Spring Cleaning
All hands on deck — let's make it beautiful 🎉
⏰ 3:00 PM – 7:00 PM

    ```
  • 🐾
    Team Bark Bark Park
    👑 Captain: Cameron Most Technical
    ⚡ Drills 🧤 Gloves 🪛 Screwdrivers 🔨 Hammer 📏 Tape Measure 🪚 Saw ⛏ Post Hole Digger 📐 Level
    • Set and dig posts — concrete cure before rails go on
    • Attach top & bottom 2×4 rails to post fronts
    • Install 2×4 fascia boards over post faces (finished look)
    • Staple welded wire mesh with galvanized U-staples
    • Install continuous 2×6 cap board along top (drink ledge!)
    • Hang double gate on the 30-ft run
    • Hang walk gate at building connection
    📋 Likely two work days — Day 1: dig & set posts (cure time). Day 2: rails, mesh & finishing.
  • 🌈
    Outdoor Team
    👑 Captain: Keyan Medium Work
    🎨 White Paint + Roller Extender 🌈 Rainbow Spray Paint ✂️ Stencils 🧹 Brooms & Dustpans 🗑️ Trash Bags ⛺ Tent + Zip Ties 🌱 Dirt / Soil
    • Touch up exterior white paint (roller + extender)
    • Paint new THIRSTY'S sign with stencils + rainbow spray paint
    • Sweep deck, patio & clean windows
    • Pull weeds out front + pick up sidewalk trash
    • Put up tent on patio, tie down with zip ties
    • Assemble new fire table
    • Touch up & extend rainbow paint on the wall
    • Fill west-facing wall only with dirt for planting
  • 🧹
    Indoor Team
    👑 Captain: Rufus Light Work
    🌀 Vacuums 🪶 Dusters 🧽 Swiffers 🫧 Spray Cleaner + Rags 🔫 Staple Gun 🔨 Hammer & Nails
    • Dust all surfaces — shelves, fixtures, behind bar
    • Vacuum floors and seating
    • Wipe down bar surfaces, stools & tables with spray + rags
    • Swiffer all floors
    • Pew upholstery — staple gun + hammer/nails (optional, only if someone is comfortable)
    🪑 Upholstery is optional — only tackle if a confident volunteer is available.
  • 🧱
    Team Wall
    👑 Captain: Eric Low Priority
    ⚠️ Only activate if enough volunteers show — most physically demanding work of the day
    ⚙️ Cement Mixer 💧 Water 🧱 Cinder Blocks + Cement 🖌️ Spray Paint (touch-up) 🧤 Gloves 🥾 Work Boots
    • Complete two sections of cinder block wall
    • Connect wall on the road side
    • Extend wall along inside parking lot — half only, leaving room for the gate
    • Spray paint touch-up on wall after completion
    🗒️ We've done this twice before — use the cement mixer. Stay hydrated!
  • ```